Project 8

Client: BOS Inspection – Root Cause Analysis

Projects Performed: 02

Assam, India

Plant detail: 70 MW / 92 MWp Solar PV Plant,

Client Name: Jakson Power

Sunkonnect deployed a team of Engineers having expertise in Transformer Design and Production to conduct RCA for the failure of a 6.25MVA Inverter Duty Transformer. The team along with the manufacturer performed detailed tests and studies on the transformer leading to the identification of the cause of failure. A detailed report was provided to the manufacturer as well as the client to improve the design and manufacturing of such transformers.

Project 7

Service Name: BOS Inspection – Factory Acceptance Test & Pre-Shipment Inspection

Projects Performed: 02

Nepal

Plant detail: Dhalkebar – Loharpatti 132 KV Transmission Line Project

Client Name: Jakson Ltd.

Sunkonnect deployed a team of Engineers having expertise in the Mechanical Structures Structure Manufacturing Facility for The Pre Shipment Technical and Quality Inspection of the material. The team identified various materials with defects leading to the rejection of a lot and the remaining material was cleared for dispatch. An RCA was conducted for the defective material and suggestions were provided to the manufacturer for improvement.

Project 6

Client: BOS Inspection – Expediting

Projects Performed: 01

Malkapur, Maharashtra

Plant detail: 70 MW Solar Power Project

Client Name: Juniper Green Field

Sunkonnect deployed a team of Engineers having expertise in Mechanical Structures at the Structure Manufacturing Facility for expediting the production of the material as per the technical and Quality criteria of the client. The team managed to successfully complete the Assignment well before the material delivery date excelling at all technical and quality parameters.