Service Name: BOS Inspection – Factory Acceptance Test & Pre-Shipment Inspection
Projects Performed: 02
Nepal
Plant detail: Dhalkebar – Loharpatti 132 KV Transmission Line Project
Client Name: Jakson Ltd.
Sunkonnect deployed a team of Engineers having expertise in the Mechanical Structures Structure Manufacturing Facility for The Pre Shipment Technical and Quality Inspection of the material. The team identified various materials with defects leading to the rejection of a lot and the remaining material was cleared for dispatch. An RCA was conducted for the defective material and suggestions were provided to the manufacturer for improvement.