Project 7

Service Name: BOS Inspection – Factory Acceptance Test & Pre-Shipment Inspection

Projects Performed: 02

Nepal

Plant detail: Dhalkebar – Loharpatti 132 KV Transmission Line Project

Client Name: Jakson Ltd.

Sunkonnect deployed a team of Engineers having expertise in the Mechanical Structures Structure Manufacturing Facility for The Pre Shipment Technical and Quality Inspection of the material. The team identified various materials with defects leading to the rejection of a lot and the remaining material was cleared for dispatch. An RCA was conducted for the defective material and suggestions were provided to the manufacturer for improvement.

Project 5

Service Name: Asset Management

Projects Performed: 01

Rajkot, Gujrat (INDIA)

Plant detail: 5 MWp Solar PV plant

Client Name: Major Developer based out of India

Sunkonnect deployed a team of Engineers for Asset Management of an Operational Solar PV Plant, The idea was to study the plant to identify the status of current performance, areas for improvement to improve yield and Plant uptime, and provide expertise to implement the recommendations. We managed to reduce the unscheduled downtime of the plant completely and improve the yield by 3%. We also implemented SOPs for Preventive and corrective maintenance to enable the site team to operate the plant at optimum.

Project 3

Service Name: PV Module at Plant

Projects Performed: 03

Malaysia

Plant detail: RCA for module rear glass crack

Client Name: Major Renewable Energy Developer

Sunkonnect deployed a team of Engineers having expertise in PV Modules fabrication and Production to conduct RCA for the rear glass cracks in the bifacial modules of a global major supplier. The team along with the manufacturer camped at the site to perform various simulations, inspections, and tests to collect the data of the affected modules. The data was studied and a report was published for clients and manufacturers. The countermeasure was proposed to prevent such failures in the future for both client and the manufacturer.

Project 1

Service Name: Audit of Li-ion battery manufacturing

Projects Performed: 01

Gujarat, India

Plant detail: 1.5GW

Client Name: Major Energy conglomerate

Sunkonnect deployed a team of Engineers & Scientists to work with clients to develop Li-ion cells and batteries along with BMS suitable for the Indian climate. The batteries shall be used for mobility as well as energy storage applications. We are working on this project by setting up an R&D line in Singapore for Li-ion cells and a pilot battery assembly line in India ultimately leading to an in-house battery manufacturing capacity of 1.5GW.